Licensing
  • Refineries:
    • RED SEA New Hydrocracking and Naphtha Complex Project
    • ANOPC Hydrocracking Complex
    • SOPC Diesel Hydrotreater
    • AMOC Lube Oil Hydrotreater
    • AMOC Study to Revamp/Upgrade the Middle Distillate Dewaxing Unit into VGO Mild Hydrocracking Unit
    • ASORC “Naphtha complex (NHT, CCR and Isomerization Unit) with a capacity 660,000 T/Y”
    • ERC (CCR & Hydrocracker)
    • APRCO (Medicinal Oil)
  • Petrochemicals:
    • SIDPEC (Butan 1), Molecular Sieve & Activated Alumina
Catalyst Supply
  • Sidpec: Molecular Sieve, Activated Alumina Siliporite, Catalyst
  • ERC: Axtrap, Inert Ceramic Balls
  • Enppi/Asorc: Catalyst, Adsorbent and Inert Balls
  • UGDC: Molecular Sieve For Mercury Removal Unit and Inert Ceramic Balls
Catalyst Handling
  • Enppi/Asorc: Catalyst Loading Activity
  • Midor: Unloading and Reloading of Catalyst, NHT Unionfining, Isomerization Penex & Hydrogen Unit
  • Eurecat/AMOC: Unloading and reloading of catalyst, Reactor 4001 MDDU.
  • Eurecat/UGDC: Unloading and reloading of catalyst, MRU Reactor.
  • AMOC: Unloading and reloading of catalyst, Reactor 4001 MDDU.
Debottlenecking
  • Abu Qir Petroleum Company: Verification of Existing Condensate Handling System
Process Packages
  • Enppi/Asorc: Calcination Dryer Package "Asorc Naphta Complex Project"
  • Enppi/Asorc: Catalyst Sampling Device
  • Enppi/Anrpc: Methanator Package " Anrpc Methanator Package Project"
  • Enppi/Bapetco: Modification to Existing VRU package "SITRA PWRI Project"
  • Enppi/PhPc: Condensate Stabilization package and Flash Gas Compressor “Atoll project”
  • Enppi/ASORC: Hydrogen Purification Box “CCR project”
  • Enppi/ASORC: Isomerizationisom Dryer Automation, Calcination Dryer Package, Hydrogen Purification Package, Hydrogen box (ASORC Naphtha Complex (ISBL) Project)
  • Enppi/Petrobel: Liquid Nitrogen Storage and Vaporization Package “ZOHR- ZH02-38” Phase 2
  • Enppi/Petrobel: Liquid Nitrogen Storage And Vaporization Package “ZOHR 104” phase 1
  • Enppi/Bapetco: Liquid Ring Compressor Package “Assil & Karam project”
  • Enppi/Gasco: Molecular Sieve Dehydration Package & Refrigeration Package “Maximization C2 & C3 from Western Desert Gas Field Project”
  • Enppi/Anrpc: Sour Gas Amine “Naphtha Hydro Treatment PKG project”
  • Enppi/Nospco: Gas Dehydration Package “ONS Field Development Project”
  • Enppi/UGDC: Mercury Removal
  • Qarun: Test Separator
Heaters
  • Midor: Probation test & thermal ratings for beaters 02HOI & 03HOI
  • Enppi/ASORC: Direct Fired Heaters ,CCR
  • Enppi/SOPC: Vacuum Fired Heater “ New Asphalt unit”
  • Burullus: Regen Heater Spare parts
  • Midor: 2 x Regeneration Gas Heater, 2 x Liquid Feed Heater, Reboiler, Hydrotreating, Steam Air Pre Heater
  • Enppi/CORC: 2 x Reboiler, 2 x Gas Heater
  • Enppi/EGPC: Reboiler
  • NPC: Reboiler
Air Coolers / Heat Exchangers
  • Enppi/Sumed: Air Cooled Exchangers (Tank Farm and Top Side Facilities LOT- II at Ain Sukhna Project)
  • Enppi/ANRPC: S&T Exchanger (Combined Feed Exchanger) CCR & Platforming Unit
  • Enppi/Bapetco: Shell & Tube Heat Exchangers (Obaiyed Field Company Cairo Tube bundle)
  • Enppi/Total E&P Yemen: Air cooler “ Kharir Development Project”
  • Enppi/Bapetco: Air Cooler Exchangers “Assil& Karam Project”
Plate Heat Exchangers
  • Enppi/Asorc: Welded Plate Heat Exchangers (PACKINOX)
  • Catalytic Reforming Units:
    • ERC: GS E&C, Mostorod, C-Regen
    • Midor: Technip International, Alexandria, UOP, CCR
  • LAB - Linear Alkyl Benzene Units:
    • ELAB, GSEC, Alexandria, UOP Pacol Paraffin Dehyn
Air Compressor & Nitrogen Generation Package
  • Petrobel: CCP N2 Skid "ZOHR Project"
  • Petobel: Air Compressor Package "Abu Rudeis Filed"
  • Petrobel: N2 Membrane “revamp unit Abu Redis”
  • Petrojet: Nitrogen package “SONKER Project”
  • Enppi/Petrobel: Nitrogen Generation System Package “ZOHR 57”
  • Enppi/Khalda : Khalda Qasr Compression Station Project Compressor Package 2x 110 Nm3/hr 37 bar(g)
  • Enppi/Burullus : Scarab Saffran Development Project West Delta Deep Marine Concession) Nitrogen generator package 100 Nm³/hr @ 97% N2 4 bar(g)
  • Enppi/Rashpetco: Rosetta Gas Field Development Project Nitrogen Membrane Generator High Pressure Gas Booster Compressor140 Sm³/hr @ 97% N2 114 Sm³/hr
  • Enppi/Qantara: Qantara Field Development Project Compressor Package & dryer Package 66 Nm³/hr & 47.5 Nm³/hr dewpoint 40°C
  • Enppi/Rashpetco: Rosetta Gas Field Development Project instrument Air 2 screw compressors & air instrument dryer 250 Nm³/hr dewpoint: 40°C & 1026 Nm³/hr dewpoint 40°C
  • Enppi/Agiba: Instrument Air Package 80 Nm³/hr dewpoint 40°C
Reactors
  • Petromaint/ EPC: PVC Reactor
Linear Programming
  • Enppi/EGPC: Crude Assay Manager & Linear Programming Software
  • ERC: H/Sched Software License and Support
  • Midor: H/COMET Web-Site Usage & Advanced Linear Programming including Haverly Assay Library
Software
  • Enppi/Asorc: C5-C6 Isomerization Isom Dryer Automation (PLC) "Asorc Naphta Complex (ISBL) Project"
Electrical
  • Ansaldo Caldaie/EEHC: Motor Control Centers & L.V Swgs “ Banha Power Station”
  • Orascom/Burullus:
    • Low Voltage Swg , L.V & MV Transf
    • Motor Control Center Swg “ 4800 MW Combined Cycle Power Plant”
    • L.V: Distribution Panels “ 4800 MW Combined Cycle Power Plant ”
  • Orascom/EEHC: L.V Distribution Panels “ New West Damietta Combined Cycle Power Plant”
  • Fores Engineering/Petrobel: Power Motor Control Center “ Baltim South West Project”
Pipeline
  • PPC: Pipeline 10" & 12"
  • Khalda: Duplex Seamless Pipeline
  • Gasco/ERC: 12” Al Masria Refinement Factory
  • Wastani: ERW Pipes 12” 70 KM “Salma, Tulip & Allium Pipelines Material”
  • Petrojet/PPC: SAW Pipes 20” 36.5 KM
  • Enppi/Petrobel: ERW Pipes 18” & 16” 15.6 KM
  • Bapetco: ERW Pipes 10 ¾” 41.7 KM
  • Qarun: ERW Pipes 10 ¾” 120 KM
  • Petrojet/El Fagr: ERW pipes 16” 10.10KM, ERW Pipes 10” 70KM – ERW Pipes 12” 22KM – ERW Pipes 8” 25 KM
  • Gasco: ERW Pipes 24” 75 KM” Taba-Sharm Gas Pipeline Project”
  • Enppi/Ampetco: ERW Pipes 16” 9.85 KM” Al Amal Field Development Project”
  • Vegas: ERW Pipes 12” & 16” 160 KM” Petro Alam Facilities Project”
Valves
  • Enppi/midor: Gate, Globe & Check Forged Valves " Midor Refinery Expansion Project"
  • Burullus: Ball Valves
  • Enppi/Asorc: Gate Globe And Check Valves, Gate ,Globe and Check ( Socket & Threaded Valves)
  • Enppi/Aramco: Small Duplex SS Valves” Yanbu South Terminal, And Rehabilitation of Onshore facilities Project”
  • Enppi/Asorc: Gate, Globe & Check Valves “Utilities & Offsite For Naphtha Complex”
  • Enppi/Bapetco: Piping Valves- Tie-in Piping Valves
  • Petrobel: Actuated Valves (On / Off Valves), Manual Valves “Baltim South West Development Project”
  • Enppi/Gupco: Piping Valves
  • Enppi/Aramco: Small Bore Valves
  • Enppi/PhPc: DBB Valves “Atoll project”
  • Enppi/Burullus: 2 years / spare parts for on/off valves
  • Enppi/Petrobel: Manual Valves BSWP-42 (A) - On/ Off valves ZRCP-07--Manual Valves BSWP-03 A - Actuated Valves (On / Off Valves) BSWP-01 - Manual & Actuated Valves “ZOHR-54 Project”- Forged Steel Gate, Globe, Check Valves “ZOHR 118”
  • Petrojet: Ball Valve Shut Down Ball Valve “Muzhil Field Dev. Project / Offshore Facilities
  • Gasco: Ball Valve 36” Pipeline Al Areish,- Ball Valves 600# 24” “Belbeis-10thof Ramadan & Abo Mady- Gamasa 24” Gas Pipeline project”- Ball Valves 600# 2”,6”,10”,20”&42 “Gamasa/Venosa 42”Natural Gas Pipeline project”
  • Sumed: Ball Valves 150# 40” & 42” – Check Valves 150# 48”
  • Enppi/E-Styrenics: Jacketed Valves
  • Various at: Wepco, Petrobel, Enppi/GPC, Agiba, Petrojet/El Hamra, Nospco, Enppi/Bapetco, Khalda, Egypt Gas, Gupco, Kharafi
Filters / Strainers
  • Petrojet/Military: Strainer “El Shat”
  • Enppi/Amerya: Filters “ Upgrading ARPC’S Phenol Extraction Project”
  • Petrojet/Arab Potash: Strainer “ Plant Optimization Production Expansion Project”
  • Enppi/Bapetco: Piping Special Items - Filters & Strainers “Obayed Pre-Compression Project”
Piping Bulk Materials
  • Many Projects at: Bapetco-AQP- Burullus - Enppi – Al-Amal – Petroamir – Suco – Khalda – APC – Gasco – GPC – Total E&P Yemen - Petrobel – E-Styrenics- ASORC - UGDC - EGPC - Alexandria Control System
Flow Elements Devices
  • Enppi/EGPC: Flow Elements
  • Enppi/Midor: Venturi Meter & Different Flow Elements
  • Fajr: Restriction Orifice Plate Material
  • Enppi/Asorc: Orifice Plates & Restriction Orifices
  • Petrobel: Thermo element for Qara Plant, RTD Spare Part For Gas Dryers at LPG and Qara Plants
  • Enppi/Gupco: Restriction Orifices & Orifice Plates
  • Enppi/Sumed: Restriction Orifice Plate 150 # 40” , 20” & 24”
  • SGA: Double Thermocouple
  • Enppi/Khalda: Venturi Tube
Internals
  • Midor: Internal, Demister
  • Eprom/Midor: Demister- STATIC
  • Petrojet: Removable Internal, Demisters, Mist Extractor Components, Internals for Reactor